Friday, February 11, 2011

The Beatnik Continues

The Selfish Knit Along is rolling right along and despite my best efforts I'm still about two weeks behind. It's been a crazy week around here complete with an ER trip for a very very sick husband. Thankfully David is doing ok and there was a lot of waiting around in the ER so I did get quite a bit of knitting done.

This sweater has cabled charts which I had never done before, its really no different than following any other kind of chart but there are small variations between them that I took Allyson's advice and color coded the different cables so that I could identify the variation quickly and find the description. 




I had a really good time of calling out "GREEN" or "RED" when I got to the right cable, although I'm sure it was a less endearing quality to my surrounding human beings. None the less, it gave me a little chuckle and kept me entertained. 



I'm really enjoying this pattern so far and I've pretty much go the charts down so that I really only need to double check stitches a few times. The trouble becomes in remembering where I am in the chart and in all of my increases. The little post it note up there comes in handy to mark where I am before I put it down and don't have a complete brain fart the next time I pick it up. So, the plan is to just keep plugging along and hoping that I can pick up some time along the way. Either way, I know I'll finish and that's what's important.

2 comments:

  1. It looks fantastic! You have made amazing progress! I can't wait to see that sweater in person. I'm going to have to use that beautiful color for something soon!

    ReplyDelete